 Bob Road Building at Crossbreak Zone |
 Bob Road Wood Box Culvert Installation |
 Completed Supply Point Barge Bulkhead |
 Construction of New Barge Bulkhead at Supply Point |
 Disco Road at 0.6km |
 Disco Road Building to Sproat Bridge |
 Drilling at the Tel Plant Site |
 Excavation at the Tel Plant Site |
 Heliforester Camp Set up in Wreck Bay |
 Loading Explosives at Tel Plant Site |
 Mobilization to site |
 Sproat Bridge & Disco Road Pioneering |
 Sproat Bridge Installation on Disco Road Teamwork! |
 Supply Point BOZ's Version |
 Supply Point Complete |
 Supply Point Final Touches |
 Unloading of Barge at Supply Point |
 Diamond Drilling at Tel Zone |
-sm.jpg) Diamond Drilling at Tel Zone |
 Dr. Meckert Logging Core from Tel Zone |
 Drill Move |
 Drill Move at Dusk |
 Morning at Tel Zone |
 Moving Drill to Charlie Pad |
-sm.jpg) Pad Building at Witness |
 Pad Building at Witness |
 Inpection of the first drill core on Banks island in over 2 decades |
 Stacked Drill Core at Tel Operations, Banks Island 2 |
 Tel Operations looking North, Banks Island |
 Tel Operations, Banks Island |
 Ben Mossman & Jason Nickel at Whistler Capital Conference |
 VTEM survey |
 VTEM survey in progress |
 Supply Point Barge landing at Wreck Bay |
 Wainwright Barge unloading cargo at Supply Point |
 Beaver aircraft landing in Wreck Bay |
 Hepler Creek |
 Kim Core Storage |